The OO Build | Trains are Running
1,805
Published 2024-06-26
00:00 Intro
00:26 Planning
08:28 Building the road bed
09:46 Laying the Track
13:44 Maintaining Cobalt Point Motors
20:09 Back to bed and track laying
29:53 Testing and rectifying
36:35 Running trains
38:23 Outro
#modelrailroad #modeltrains #modelrailway #railway #oogauge #modelbahn #trains #diorama
All Comments (9)
-
Nice video mate, great to see you've got trains running!
-
Your patience knows no bounds, given the other projects you have completed to a very high standard I’m looking forward to seeing how this one progresses
-
Brilliant video James, great to see trains running and excited to see how the layout progresses 👍
-
Really valuable stuff here in lots of areas ! Great to watch your problem solving, I've learned a lot of things to watch out for.
-
Fabulous layout! labour of love and thanks for sharing the journey!!!😊
-
Always interesting to see how somebody else builds their layout!👍 The Colbalt motors look very similar to Tortoise – never needed to dismantle one even after two decades. 🙂 If you want an interesting urban viaduct to model, take a look at New Viaduct Street in Manchester where railway and road both pass over the Ashton Canal with all three passing over the River Medlock. Adjacent to this the road and railway pass over Metrolink…..
-
Peco and Legacy bullhead track comes with correct sleeper spacing.
-
I like that idea of yours to haul a goods train out to the fiddle yard with 1 loco and then send out another loco to retrieve the wagons and bring them back; I am going to bank that idea. On the elevated curved section, did you consider using DCCconcepts PowerBase system to assist the more uncooperative locos?