The OO Build | Trains are Running

Published 2024-06-26

All Comments (9)
  • Your patience knows no bounds, given the other projects you have completed to a very high standard I’m looking forward to seeing how this one progresses
  • Brilliant video James, great to see trains running and excited to see how the layout progresses 👍
  • @michaelball68
    Really valuable stuff here in lots of areas ! Great to watch your problem solving, I've learned a lot of things to watch out for.
  • @davestrains
    Fabulous layout! labour of love and thanks for sharing the journey!!!😊
  • @ewhurstgreen
    Always interesting to see how somebody else builds their layout!👍 The Colbalt motors look very similar to Tortoise – never needed to dismantle one even after two decades. 🙂 If you want an interesting urban viaduct to model, take a look at New Viaduct Street in Manchester where railway and road both pass over the Ashton Canal with all three passing over the River Medlock. Adjacent to this the road and railway pass over Metrolink…..
  • Peco and Legacy bullhead track comes with correct sleeper spacing.
  • I like that idea of yours to haul a goods train out to the fiddle yard with 1 loco and then send out another loco to retrieve the wagons and bring them back; I am going to bank that idea. On the elevated curved section, did you consider using DCCconcepts PowerBase system to assist the more uncooperative locos?